Construction of Technical Infrastructure System for the Urban Area – Park – Administrative Center

Ảnh chụp màn hình 2025 12 09 091402

PROJECT OVERVIEW

    • Location: Vinh Thai Commune, Nha Trang City, Khanh Hoa Province

    • Project Type/Grade: Project Grade: Grade III

    • Total Investment: Approximately 654 billion VND

    • Project Owner: Khanh Hoa Province Development Project Management Board

    • Contract: No. 27/2025/HDTV-BIM

Project details

  • Goals and benefits
  • Highlights
  • Progress & Results
  • Participating experts
  • Design duration

OBJECTIVES

  • Provide consultancy for establishing Building Information Modeling (BIM) during the Feasibility Study (FS) phase for the project: “Construction of Technical Infrastructure System for the Urban Area – Park – Administrative Center” in Khanh Hoa Province.
  • Develop a detailed BIM Execution Plan (BEP), specifying regulations for the Common Data Environment (CDE) usage and coordination processes among stakeholders.
  • Develop 3D BIM models and 3D view sets to support design alternative analysis, quantity takeoff, and the preparation of the Feasibility Study report.

BENEFITS

Establish a data foundation serving the subsequent phases of design – construction – operation & maintenance (O&M).

Standardize data right from the FS stage, facilitating control over quantities, costs, and investment schedule.

Enhance coordination capabilities and minimize design conflicts (clashes) by working on a unified BIM model.

Contract Type: Lump sum BIM consultancy contract.

Contract Value: 84,578,000 VND (Breakdown: Pre-tax 78,312,962 VND, VAT 6,265,038 VND).

Diverse Scope of BIM Deliverables, including:

  • Detailed BIM Execution Plan (BEP).
  • Regulations on Common Data Environment (CDE) usage & coordination workflows.
  • BIM models, federated models, 3D views, comprehensive reports, and documentation serving the Feasibility Study (FS) report.

Application: Implementation of BIM for a large-scale technical infrastructure project (urban area – park – provincial administrative center).

CONTRACT TIMELINE & DELIVERABLES

  • Date of Signing: July 2, 2025, in Khanh Hoa.

  • Contract Duration: Approximately 60 days from the effective date of the contract.

Contract Deliverables:

  • Detailed BIM Execution Plan (BEP) for the entire project.

  • Common Data Environment (CDE) protocols and coordination workflows.

  • 3D BIM models, federated models, and 3D views.

  • Model reports, supplementary reports, documentation serving the Feasibility Study (FS) Report, and other relevant documents.

11 participating experts, including:

Transport & Civil Engineers responsible for BIM modeling, coordination, and model implementation.

BIM Manager

BIM Coordinators

Design/BIM Phase: Feasibility Study (FS) Stage.

Design Duration (as per Contract): Estimated approximately 60 days from the effective date of the contract.