PROJECT OVERVIEW
-
-
Location: Khanh Hoa Province, section from Km0+00 to Km22+00
-
Type and Grade of Work: Transportation Infrastructure Works (Expressway/Highway) Class I
-
Construction Supervision Consultancy Contract Value: 12,500,000,000 VND (Twelve billion five hundred million Vietnamese Dong)
-
Investor/Project Owner: Phuc Son Group Joint Stock Company (JSC)
-
Contract: No. 23/2023/HDTV
-
Project details
-
Goals and benefits
-
Highlights
-
Progress & Results
-
Participating experts
-
Design duration
Scope of Supervision: Supervision of construction execution for the section from Km0+000 to Km22+000 (including surveying and construction working drawing design).
Key Responsibilities: Supervision of quality, quantity (work volume), progress (schedule), traffic safety, occupational safety, and environmental protection throughout the construction process.
Consulting Joint Venture Contractor: Construction Technology, Equipment, and Inspection Consulting Joint Stock Company – CONINCO10 and T2711 Consulting Joint Stock Company.
Allocation of Supervision Scope:
T27 Company: Responsible for supervising the section from Km10+000 to Km22+000.
CONINCO: Responsible for supervising the section from Km0+000 to Km10+000.
-
Contract Execution Period: 1,096 days.
-
Commencement/Duration: Commencing from the date of signing the Master Agreement/Principal Contract and concluding upon the expiration of the Works Warranty period.
-
Implementation Schedule: Aligned with the construction period of Bid Package No. 12 (Construction and Installation Package No. 01).
Project Management Board (PMB): 07 personnel (including the Deputy Head of the PMB and Project Management Officers).
Design Consultant (Truong Son Consulting Joint Stock Company): 05 personnel
Implementation Schedule: Aligned with the construction period/duration of the Bid Package.