Coastal Cities Sustainable Environment Project – Nha Trang Sub-project

PROJECT OVERVIEW
-
-
Location: Nha Trang City – Khanh Hoa Province
-
Type/Grade of Works: Transport works, Grade IV
-
Total Investment: Approximately VND 248 billion
-
Project Owner: Khanh Hoa Provincial Development Project Management Unit
-
Contract: No. 15A/2016/T27-HDKS
-
Project details
-
Goals and benefits
-
Highlights
-
Progress & Results
-
Participating experts
-
Design duration
Erosion Control & Bank Protection: Construction of the road and embankment along the Southern bank of the Cai River to mitigate erosion and protect the riverbank and adjacent residential areas.
Transport Network Completion: Completion of the regional transport network by connecting 2/4 Road, Ring Road 2, and the salinity prevention dam, thereby improving accessibility and transport mobility.
Infrastructure & Landscape Enhancement: Improvement of drainage infrastructure, lighting, and greenery – contributing to the enhancement of living conditions and the urban landscape, in alignment with the objectives of the “Coastal Cities Sustainable Environment Project – Nha Trang Sub-project”.
Package NT-2.1: Construction of Road and Embankment along Cai River
(Under the “Coastal Cities Sustainable Environment Project – Nha Trang Sub-project”)
World Bank (WB) ODA loans combined with the counterpart funds from Khanh Hoa Provincial Budget.
Classification of Works:
South Cai River Bank Road: Regional transport road, Grade III.
South Cai River Bank Embankment: Agriculture and Rural Development works (Hydraulic works), Grade IV.
Technical Solutions:
Roadworks: Filled roadbed; pavement structure designed in sections with varying load-bearing capacity requirements.
Embankment: Utilizes Reinforced Concrete (RC) gravity retaining walls and Prestressed Concrete (PC) sheet piles; anchored by a PHC-D500mm spun concrete pile system.
Scour Protection: The embankment toe is reinforced against scouring using gabion boxes.
Landscape & Utilities:
Development of parks, greenery, and lighting systems.
Irrigation water supply system (utilizing both municipal water and boreholes) to create a continuous landscape strip along the riverbank.
Funding Source: World Bank (WB) ODA loans combined with the counterpart funds from Khanh Hoa Provincial Budget
-
Approval Decision: Decision on the approval of the Construction Drawing Design and Cost Estimates issued by the People’s Committee of Khanh Hoa Province, No. 48/QD-UBND dated January 7, 2021 (referenced from file name).
-
Execution Duration: 18 months.
-
Approved Cost Estimates:
-
Construction Cost (after tax): VND 226,037,687,184.
-
Total Estimated Cost (including Project Management costs, consultancy, other costs, and contingency): VND 248,484,137,560 (rounded to VND 248,484,138,000).
-
06 Team Leaders
04 Technical Staff
Construction Drawing Design Phase: 10 months