1. Introduction to BIM

🏗️ What is BIM?

BIM (  Building Information Modeling) is an intelligent process based on 3D models, helping professionals in the field of design, construction and operation of works have tools to plan, coordinate and manage projects more effectively.

BIM is not just a software, but an integrated working method, allowing all stakeholders in a construction project to work together on a single data model, from the design stage to construction and operation.

2. Company Introduction T27

2006 Year of establishment
2017 Start BIM
10+ BIM Projects

T27 Consulting Joint Stock Company  was established in 2006, headquartered in Nha Trang, Khanh Hoa province. With the motto  “The heart of every project” , T27 specializes in providing the following services:

  • Design consultancy:  Bridges, roads, technical infrastructure
  • Topographic and geological survey:  Application of UAV and GPS RTK technology
  • Construction supervision:  Ensuring construction quality
  • BIM Modeling:  From LOD 200 to LOD 400

3. BIM Development Schedule

2017
BIM Kick-off  – Start applying BIM at the company with the Ngoc Hoi Interchange project. This is the first step in applying BIM technology to traffic infrastructure design.
2019-2021
Development  – ​​Expand BIM application to larger projects. Train staff and build standardized BIM workflows.
2022-2023
Advanced  – BIM implementation for Highway 26B project. Complete coordination and clash detection process.
2024-2025
Professionalization  – Deploying BIM LOD 300-350 for BVTC projects. Building CDE and participating in large-scale highway projects.

4. BIM Technical Capability

BIM software in use

🏗️ Model Group

Revit
Architectural & Structural Models
Civil 3D
Infrastructure design
Tekla
Steel structure model

💾 Data Management Team

Navisworks
Coordination & Clash Detection
BIM 360
Autodesk Cloud Platform
CDE Bimnext
Common Data Environment

🤖 Automation Group

Dynamo
Visual programming
C#
API & Plugin development
WHO
Artificial intelligence

BIM Levels of Development (LOD)

  • LOD 200:  Basic Design Phase (TKCS) – Conceptual Model
  • LOD 300:  Engineering Design Phase – Detailed Modeling
  • LOD 350:  BVTC Phase – Fully Coordinated Model
  • LOD 400:  Construction Phase – Fabrication and installation model

5. Completed Projects

National Highway 26B

Upgrading and Expanding National Highway 26B

Investment project to upgrade and expand National Highway 26B, Khanh Hoa province – The first project of T27 to comprehensively deploy BIM.

Project Group B
Level II construction level
Technical level: Grade III road, V=80km/h
Total investment 865,474 billion VND

6. Ongoing Projects

Quy Nhon - Pleiku Expressway

Quy Nhon – Pleiku Expressway

Basic Design Phase (TKCS) with BIM LOD 200 model. Including bridges: An Phong 2, An Phong 1, Groi 1, Groi 2, Groi 3 and underpasses.

Road connecting Quy Hoa urban area

Road connecting Quy Hoa – Long Van Urban Area

BVTC phase with BIM LOD 300-350 model. Connecting Quy Hoa Science and Education Urban Area with Long Van area.

Roadbed width 12m
Construction level: Grade I bridge, Grade II road
QL1D overpass L = 137.4m
Total investment 1,106,993 billion VND
Khanh Hoa Urban Area Infrastructure

Infrastructure of Urban Area – Park – Administrative Center of Khanh Hoa Province

TKCS phase with BIM LOD 200 model. Building technical infrastructure system for the new urban area in South Nha Trang.

Level III construction
Project type: Technical infrastructure
Location: Nam Ward, Nha Trang
Total investment 654,288 billion VND
Headquarters of departments and branches

Headquarters of Departments, Boards and Branches of Khanh Hoa Province

Design phase with BIM LOD 200 model. Design internal road system with 20km/h speed, rainwater drainage system, wastewater drainage system and technical trench.

7. BIM Development Orientation

🎓 Advanced training

Strengthen BIM training to improve staff capacity, towards international standards.

💾 Common Data Environment (CDE)

Build and operate a CDE to ensure consistent and transparent information sharing throughout the entire project life cycle.

📊 BIM 4D/5D

Applying BIM 4D/5D in progress and cost management, preparing the foundation for As-Built deployment and construction operation.

🚀 Key projects

Proactively participate in large-scale infrastructure projects, affirming the pioneering role in the field of transport infrastructure.

8. Goals to Strive For

  • 🏆 Regional leader:  Become the leading unit applying BIM in infrastructure projects in Khanh Hoa, Gia Lai and expand to many other provinces and cities.
  • 📐 LOD 350 standard:  Ensure design projects meet LOD 350 standards, contributing to improving design and construction quality.
  • 🛤️ National projects:  Capable of participating in key national projects such as the East-West expressway and the North-South high-speed railway.

9. Roles of Parties in BIM Projects

A. Design Phase

  • The investor determines the LOD and approves the CDE
  • Consulting on design and creation of detailed BIM models
  • Perform Clash Detection between disciplines
  • Consulting on auditing and checking for consistency

B. Construction Phase

  • Using BIM model to schedule 4D
  • 5D Volume Extraction
  • LOD 400 Development Contractor
  • Updates from the scene

C. Operational Phase

  • Adopting the As-Built (6D) model
  • Integration into CAFM/CMMS/GIS systems
  • Asset management, maintenance scheduling
  • Evolving into a Digital Twin

Conclude

T27 affirms its pioneering role in the field of infrastructure BIM in Vietnam through systematic application and commitment to providing the most optimal solutions, with the motto:

“T27 – The heart of every project”

Leave A Comment

All fields marked with an asterisk (*) are required