Component Project 1 (Sub-project 1) of the Investment Project for the Construction of the Khanh Hoa – Buon Ma Thuot Expressway (Phase 1)

image

PROJECT OVERVIEW

    • Location: Khanh Hoa Province, section from Km0+00 to Km22+00

    • Type and Grade of Work: Transportation Infrastructure Works (Expressway/Highway) Class I

    • Construction Supervision Consultancy Contract Value: 12,500,000,000 VND (Twelve billion five hundred million Vietnamese Dong)

    • Investor/Project Owner: Phuc Son Group Joint Stock Company (JSC)

    • Contract: No. 23/2023/HDTV

Project details

  • Goals and benefits
  • Highlights
  • Progress & Results
  • Participating experts
  • Design duration

Scope of Supervision: Supervision of construction execution for the section from Km0+000 to Km22+000 (including surveying and construction working drawing design).

Key Responsibilities: Supervision of quality, quantity (work volume), progress (schedule), traffic safety, occupational safety, and environmental protection throughout the construction process.

Consulting Joint Venture Contractor: Construction Technology, Equipment, and Inspection Consulting Joint Stock Company – CONINCO10 and T2711 Consulting Joint Stock Company.

Allocation of Supervision Scope:

T27 Company: Responsible for supervising the section from Km10+000 to Km22+000.

CONINCO: Responsible for supervising the section from Km0+000 to Km10+000.

  • Contract Execution Period: 1,096 days.

  • Commencement/Duration: Commencing from the date of signing the Master Agreement/Principal Contract and concluding upon the expiration of the Works Warranty period.

  • Implementation Schedule: Aligned with the construction period of Bid Package No. 12 (Construction and Installation Package No. 01).

Project Management Board (PMB): 07 personnel (including the Deputy Head of the PMB and Project Management Officers).

Design Consultant (Truong Son Consulting Joint Stock Company): 05 personnel

Implementation Schedule: Aligned with the construction period/duration of the Bid Package.