PROJECT OVERVIEW

    • Location: Nha Trang City – Khanh Hoa Province

    • Type/Grade of Works: Transport works, Grade IV

    • Total Investment: Approximately VND 248 billion

    • Project Owner: Khanh Hoa Provincial Development Project Management Unit

    • Contract: No. 15A/2016/T27-HDKS

Project details

  • Goals and benefits
  • Highlights
  • Progress & Results
  • Participating experts
  • Design duration

Erosion Control & Bank Protection: Construction of the road and embankment along the Southern bank of the Cai River to mitigate erosion and protect the riverbank and adjacent residential areas.

Transport Network Completion: Completion of the regional transport network by connecting 2/4 Road, Ring Road 2, and the salinity prevention dam, thereby improving accessibility and transport mobility.

Infrastructure & Landscape Enhancement: Improvement of drainage infrastructure, lighting, and greenery – contributing to the enhancement of living conditions and the urban landscape, in alignment with the objectives of the “Coastal Cities Sustainable Environment Project – Nha Trang Sub-project”.

Package NT-2.1: Construction of Road and Embankment along Cai River

(Under the “Coastal Cities Sustainable Environment Project – Nha Trang Sub-project”)

World Bank (WB) ODA loans combined with the counterpart funds from Khanh Hoa Provincial Budget.

Classification of Works:

South Cai River Bank Road: Regional transport road, Grade III.

South Cai River Bank Embankment: Agriculture and Rural Development works (Hydraulic works), Grade IV.

Technical Solutions:

Roadworks: Filled roadbed; pavement structure designed in sections with varying load-bearing capacity requirements.

Embankment: Utilizes Reinforced Concrete (RC) gravity retaining walls and Prestressed Concrete (PC) sheet piles; anchored by a PHC-D500mm spun concrete pile system.

Scour Protection: The embankment toe is reinforced against scouring using gabion boxes.

Landscape & Utilities:

Development of parks, greenery, and lighting systems.

Irrigation water supply system (utilizing both municipal water and boreholes) to create a continuous landscape strip along the riverbank.

Funding Source: World Bank (WB) ODA loans combined with the counterpart funds from Khanh Hoa Provincial Budget

  • Approval Decision: Decision on the approval of the Construction Drawing Design and Cost Estimates issued by the People’s Committee of Khanh Hoa Province, No. 48/QD-UBND dated January 7, 2021 (referenced from file name).

  • Execution Duration: 18 months.

  • Approved Cost Estimates:

    • Construction Cost (after tax): VND 226,037,687,184.

    • Total Estimated Cost (including Project Management costs, consultancy, other costs, and contingency): VND 248,484,137,560 (rounded to VND 248,484,138,000).

06 Team Leaders
04 Technical Staff

Construction Drawing Design Phase: 10 months

Some pictures of the project