Project: Detailed planning of the service road system along the National Highway in Khanh Hoa province

PROJECT OVERVIEW
-
- Location: Khanh Hoa province
- Type and level of construction : Traffic works, level IV plain roads
- Contract value : 544.5 billion VND
- Consulting contract value : 1,973,203,000 VND.
- Investor : Khanh Hoa Department of Transport
- Contract : No. 024/2011/HDKT-T27
Project details
-
Goals and benefits
-
Highlights
-
Progress & Results
-
Participating experts
-
Design time
Road safety corridor management : Management and use of road safety corridors of national highways in Khanh Hoa province.
Ensuring traffic safety : Eliminate illegal connection points to National Highways, ensure traffic safety and improve exploitation capacity on national highways.
Legal basis for construction : As a basis for land use management and construction licensing along National Highways.
Large-scale scope : The service road is designed along National Highways 1, 26, 26B, and 27B with a total length of the national highway of about 206.81 km.
Design solution : The service road is planned to follow both sides of the national highway with a minimum distance from the center of the national highway to the service road being 33m.
Service road scale : Minimum design of 2 lanes, minimum roadbed width of 10m, asphalt concrete road surface structure.
Large volume : The total land area expected to be occupied for the frontage road on National Highway 1 is approximately 272.34 hectares.
Total implementation time: 210 days.
Completion time: When the planning documents are approved.
5 key personnel (Technical leadership and management) and identified a total implementation team of about 13 people.
Construction phase: 120 days (according to construction package No. 16).
Warranty period: 12 months.